As work resumes on-site at 158 Front Street East after the long weekend break, the focus will be on continuing to build the at-grade or ground floor concrete slab.
This work is being undertaken in sections and stages. Decking will continue to built out in areas of the site that remain open to the P1 level slab. Walls and columns will be formed and rebar will be installed.
As sections of are decked and formed, concrete pouring and finishing will follow. Some of the concrete work will also be done in stages for a given section of the ground floor level, depending the complexity of the specific area being poured.
We will provide updates as necessary through the week if work details change. At the end of the week will post details if any Saturday work is scheduled. Please check back for updates.