This week at 158 Front Street work continues on preparing, forming and pouring concrete for the P1 slab level. Work will also continue on the ramp that will run from street level to the P3 level. Columns that run from the P1 level to the grade (street level) slab floor will also be formed and poured.
Concrete trucks will arrive during the day at both the Frederick Street entrance and the Sherbourne Street entrance.
Concrete is poured during the day and concrete finishing continues through the afternoon and into the evening.